On June 6, the first wind turbine of Tianping 200MW Wind Power Project in Tengxian of CR Power Guangxi Co., Ltd. was hoisted and installed. The total investment of the project is RMB 1.298 billion, and the annual on-grid energy is 357 million kWh. After the project is put into operation, it can save 108,700 tons of standard coal and reduce 296,600 tons of carbon dioxide emissions every year.